Ordering Guidelines

Over the Post Ordering Guidelines

These checklists are designed to provide an accurate and complete list of components needed to build an Over the Post Stair System. Feel free to open this document and print copies to use while performing stairway takeoffs.

 

Post to Post Ordering Guidelines

These checklists are designed to provide an accurate and complete list of components needed to build a Post to Post Stair System. Feel free to open this document and print copies to use while performing stairway takeoffs.

 

Linear Collection Cable or Tube System Ordering Guidelines

This checklist is designed to provide an accurate and complete list of Linear Collection components needed to build a stainless steel cable or tube infilled Stair System or level run. Feel free to open this document and print copies to use while performing stairway takeoffs.

 

Linear Collection Panel System Ordering Guidelines

This checklist is designed to provide an accurate and complete list of components needed to build a panel system stairway or level run. Feel free to open this document and print copies to use while performing stairway takeoffs.

 

Linear Cable, Tube, Panel Quote and Order Takeoff Forms

The following forms are used to make the necessary selections for an L.J. Smith cable, tube or panel system to accommodate your stairway floorplan. Complete the applicable form and forward it to your L.J. Smith supplier or sales representative to obtain a materials list.

Cable and Tube Systems 

Panel System for Open Tread Stairs - for stairs with 7 1/2" Rise and 10" Run combination

Panel System for Open Tread Stairs - for stairs with a Rise and Run that is any combination other than 7 1/2" Rise and 10" Run

Panel System for Kneewall Stairs - for stairs with a kneewall angle of 36.9 degrees

Panel System for Kneewall Stairs - for stairs with a kneewall angle that is anything other than 36.9 degrees

 

To top